"Dynamic Underground Stripping"
Savannah River Site - M-Area - Aiken, SC
 
Client:

Department of Energy

Scope of Work:

Consist of 2,100 feet of Vapor Piping, 3" through 30" carbon steel piping, connecting 34 vapor extraction wells. 2,100 feet of 10" Steam piping connecting 63 steam injection wells, 6,000 feet of 1"- 3" Carbon steel air, condensate, and ground water piping. Install appprox. 400 pre-insulated pipe shoes. Furnish and install (2) stainless steel heat exchangers, (1) 2 cell cooling tower, (2) air compressors with dryers, (15) pumps, associated process water and compressed air piping. Set 5 processing tanks with associated piping filters.

Location:

Savannah River Site -- M-Area

Construction Cost:

$3.5 M for Mechanical

Project Duration:

1 year