Client:
Department of Energy
Scope of Work:
Consist of 2,100 feet of Vapor Piping, 3" through
30" carbon steel piping, connecting 34 vapor extraction wells. 2,100
feet of 10" Steam piping connecting 63 steam injection wells, 6,000
feet of 1"- 3" Carbon steel air, condensate, and ground water
piping. Install appprox. 400 pre-insulated pipe shoes. Furnish and install
(2) stainless steel heat exchangers, (1) 2 cell cooling tower, (2) air
compressors with dryers, (15) pumps, associated process water and compressed
air piping. Set 5 processing tanks with associated piping filters.
Location:
Savannah River Site -- M-Area
Construction Cost:
$3.5 M for Mechanical
Project Duration:
1 year |